Facilities 
 Rocky River Treatment Plant
 Muddy Creek Treatment Plant
 Mt.Pleasant Water Treatment Plant
 Lake Don T. Howell
 Lake Concord
 Black Run Reservoir
 Laboratory
 Interceptor Sewer Collection System
 Contract Operations
Interceptor Sewer Collection System

WSACC currently operates and maintains approximately one hundred sixteen (116) miles of interceptor sewer, ranging in size from 12 inches in diameter to 72 inches in diameter, and four (4) remote pump stations which transport wastewater to the RRRWWTP and the MCWWTP.

Operational and maintenance activities of the department include:

  • New construction;
  • Design and structural criteria review, and general inspections.
  • Pump stations: Bi-weekly inspections, operational and maintenance modifications, scheduled preventive maintenance and repairs.
  • Interceptor sewers: Physical and visual inspections of the system, manhole rehabilitation, associated right-of-way maintenance, various flow monitoring, wastewater quality testing, and rainfall recording.